Back to products
Information

The T2500 will support the connection of up to three phases, but will react on the largest of these three measurements. The current measurements are done through external current transformers (CTs) – typically with a secondary current of 5A.

The Over-Current function can be adjusted to trip within the range of 0.5 to 1.4 x I (input current). The delay of the Over-Current function can be set between 3 to 30 seconds. The Short-Circuit function operates within the range of 1.0 to 4.0 x I. The Short-Circuit delay can be set between 0.1 and 1 second.

The T2500 will react on the highest of the three input currents. The Pick-up LED will ignite as soon as the level is exceeded, while the relay is activated only after the delay has passed.

Related products:
SELCO - P.O. Box 113 - Betonvej 10 - DK-4000 Roskilde - Phone: +45 70 26 11 22 - Fax: +45 70 26 25 22 Copyright © 1995 - 2009 - SELCO